Truecz: Difference between revisions
Jump to navigation
Jump to search
No edit summary |
No edit summary |
||
Line 1: | Line 1: | ||
These are the actual Z of the floor and ceiling. This is also modified by a SE with a lotag of 17 | These are the actual Z of the floor and ceiling. This is also modified by a SE with a lotag of 17, which is used for Elevator Transports. | ||
[[Category:Player structure members]] | [[Category:Player structure members]] |
Revision as of 01:27, 8 September 2006
These are the actual Z of the floor and ceiling. This is also modified by a SE with a lotag of 17, which is used for Elevator Transports.